Leaks · drains · taps · water heaters

plumber service in koh samui by chk company

Plumbing and sanitary work on Koh Samui — leak repair, drains, taps, water heaters and pumps. Site visit before quote from CHK / Samui Fixit.

Plumbing solutions

Filter by job type — pipe access, existing fittings and mountain vs flat access confirmed on site before your QT.

  • Leak detection & pipe repair

    Ceiling stains, under-sink drips and loose joints — isolate, replace section or re-solder as needed.

    • Same/next day
    • Photo quote
  • Burst pipe & shut-off help

    Locate main valve, temporary clamp and permanent fix — coordinate with emergency hub when after hours.

    • 24/7 option
    • Mountain access
  • Villa repipe sections

    Replace corroded runs with uPVC or PEX — chase or surface route agreed before tile patch quote.

    • With tile hub
    • BOQ split
  • Drain unclog & snake

    Kitchen, bath and floor traps — camera/snake when access allows; grease trap clean for F&B.

    • Commercial OK
    • Access hatch
  • Grease trap & floor drain

    Restaurant and villa kitchen lines — schedule PM to avoid weekend shutdowns.

    • PM contract
    • Night slot
  • Tap & mixer install/repair

    Kitchen, basin and outdoor bib taps — cartridge, washer or full swap with owner-supplied sets OK.

    • Owner-supplied OK
    • Cash ≤ ฿2k
  • Shower & diverter valve

    Weak flow, stuck diverter or concealed valve service — access panel noted in QT.

    • With glass hub
    • Pressure check
  • New water points & reroute

    Extra basin, dishwasher stub or outdoor shower — tie-in to existing header with shut-off plan.

    • With renovation
    • Tile patch note
  • Storage & instant water heaters

    Wall mount, electrical load check with electrical hub — relief valve and drip tray included.

    • With electrical hub
    • Brand install
  • Booster pump & pressure tank

    Weak upper-floor flow on hillside villas — size pump to peak demand and quiet hours.

    • Mountain villas
    • PM schedule
  • Water tank & float valve

    Overflow, stuck float or cracked tank fittings — ladder access and safety noted on site.

    • Roof access
    • Same-week
  • Plumbing snag & villa PM

    Pre-rental checks, developer punch lists and quarterly valve exercise for absent owners.

    • Punch list
    • With toilet hub

Indicative solutions only — hidden pipe routes, tile work and strata rules must be confirmed on site. Warranty starts after full payment; excludes blockages from misuse or foreign objects.

How we help

Brief & urgency

  • LINE or call with photos, video of active leak and whether main water can be shut off.
  • Flat vs mountain access and parking for long ladder or pump kit noted before dispatch.
  • Occupied rooms, pets and power/water outage windows confirmed with owner or PM.
  • Flag jobs needing toilet install, tile patch or electrical load check in one plan.

Site visit & QT

  • Trace visible pipe runs, pressure test where safe and log tile/paint patch needs.
  • BOQ splits labour, parts, access and disposal — VAT 7%, 50% deposit over ฿10,000.
  • Photo and short video report for owners abroad and insurance files.
  • Cash on site up to ฿2,000 for small tap and leak fixes when agreed upfront.

Repair & install

  • Isolate water, protect floors and furniture — pressure and leak test before sign-off.
  • Use owner-supplied fixtures when spec matches rough-in and warranty terms agreed.
  • Coordinate tile, glass and electrical trades when walls or ceilings are opened.
  • Leave shut-off map and parts list for villa handover binders.

Koh Samui delivery

  • One CHK team for plumbing, toilet install, renovation and emergency follow-ups.
  • English and Thai updates for villa owners and overseas property managers.
  • Formal QT numbering QTyyyymmXXXX and INV-YYYY-NNNN for accounting.
  • Warranty starts after full payment; natural disaster and misuse excluded per CHK terms.

Reliable plumbing on Koh Samui

Send photos or video of the leak, tap or drain issue — we reply on LINE with a visit slot and QT outline.