Full bathroom remodel
Strip-out, new waterproofing, tile, plumbing, WC, shower and vanity — phased for occupied villas.
Waterproof · Tile · Fixtures
Bathroom renovation on Koh Samui — waterproofing, tile, fixtures and glass showers. Site survey, BOQ and QT from CHK / Samui Fixit.
Filter by scope — layout changes, humidity and access (flat vs mountain) are confirmed in the QT after site survey.
Strip-out, new waterproofing, tile, plumbing, WC, shower and vanity — phased for occupied villas.
Cementitious or liquid membrane on shower floors and walls — flood test before tiling.
Remove tub, lower curb or curbless drain — re-route waste and fall to new drain point.
Porcelain, ceramic or large-format slabs — anti-slip floor and feature walls.
Wall-hung or floor-standing WC — bidet spray, soft-close seats and smart units.
Quartz, solid surface or stone tops with undermount basins — CHK counter team.
Frameless or semi-frameless panels — tempered glass with silicone and hardware to spec.
Exhaust fans, ducting and humidity control — critical for Samui’s coastal climate.
Find and fix active leaks, rotten subfloor or failed membrane — document before cosmetic work.
Batch upgrades between seasons — identical room types, minimal guest disruption.
New fixtures, paint and accessories without full demolition — when waterproofing is still sound.
Measure room, check waste routes, moisture and access — photos and BOQ before QT.
Photos and durations are typical examples. Hidden leak damage, layout changes and imported fixtures are documented in the QT before work starts.
Send room dimensions, photos of leaks or old tile — we reply on LINE with survey slots and a BOQ / QT outline.